- This event has passed.
RESccheck Interactive-T1
Instructor: Hope Medina Description: Why does this software allow for me to install an R-38 continuous insulation for the roof, but the requirement from the table says R-49 is required. This is a great question, and we hope to answer for you during our use of this software. This software was provided to anyone to use for free to demonstrate compliance with the energy code. The IECC is part of the I-code family and so there for is utilized for the health safety and welfare of the occupants of the building. Not to forget the energy efficiency and comfortability for the occupants as they use the building, and none of that is possible without a strong energy code compliant thermal envelope. How can we demonstrate we meet all of these needs and requirements of the energy code?